One thought on “Boehm and Turner 2003 Arch and Risk time plus Rework time equal Total added time vs project size”

  1. I can believe there are high risk projects requiring 40% or more of upfront planning. But I really can’t believe that there’s a ‘sweet spot’ of over 40% upfront planning time for _all_ large projects based purely on size alone. That seems rather pessimistic.