Boehm and Turner 2003 Arch and Risk time plus Rework time equal Total added time vs project size
One thought on “Boehm and Turner 2003 Arch and Risk time plus Rework time equal Total added time vs project size”
I can believe there are high risk projects requiring 40% or more of upfront planning. But I really can’t believe that there’s a ‘sweet spot’ of over 40% upfront planning time for _all_ large projects based purely on size alone. That seems rather pessimistic.